Set point
In the construction industry, the term ‘set point’ (or sometimes set-point or setpoint) typically refers to the point at which a building system is set to activate or deactivate.
For example, a heating system might be set to switch on if the internal temperature falls below 20°C, an extract fan might be set to switch on if the relative humidity in a room exceeds 65% and so on.
Set points can be fixed, adjustable or variable. An adjustable set point might be controlled for example by a manually-operated thermostat. A variable set point might be controlled by some form of calculation, for example, set points for air conditioning systems may be programmed to be higher when outdoor temperatures are higher as people are more conditioned to, and dressed for those higher temperatures. Alternatively, if a building is unoccupied, the set point for the heating might be programmed to reduce to just 5°C to prevent pipework from freezing.
The set point at which something is activated may be different from the set point at which it is de-activated. This prevents continually switching on and off if the conditions are very close to the set point.
Set points may be fine-tuned during the commissioning process, and building occupants may be given control of some set points, perhaps within prescribed parameters.
Set points should be monitored, and checked regularly to ensure that they are correctly set and that they are delivering the required result. Seemingly small changes in set points can have a significant impact on performance and energy use. In addition, some building spaces may house critical operations requiring very specific, closely-controlled set points.
It is important therefore that building operators and occupants are provided with an explanation of set points, their operating ranges, and the impact of adjustments on performance and energy use.
NB Guide to Controls (BG 83/2023) written by John Marrow and published by BSRIA in June 2023, defines setpoint as: ‘An adjustable level of a parameter, such as temperature, humidity or pressure, which a control system aims to achieve.’
[edit] Related articles on Designing Buildings
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.